Title taken from verso. Verso reads: "13 Feb 75. DACW 85-75-C-0026. Tanana River Bank Prot. Dragline exc. plug @ sta 20. Clark." Image shows work being performed by a dragline excavator in February under Army Corps of Engineers contract...
Title taken from verso. Verso reads: "P. 4 & 5 OIL. 5 col x 36 PICA. 145. 36. Contractor's access road and bridge. The Chena River outlet works will be built in the stream at the center upper section of this photo. Sept. '74. Chena Outlet---."...
Title from image. Verso reads: "P.5 -OIL. 2 col x 25 1/2 PICAS. "Chena Sign --" Cutline. 100. 26." Verso also stamped with the U.S. Army Corps of Engineers logo and the dates Sept. 1974 and Jan 16, 1975. Image shows a sign posted in...
Title taken from verso. Verso reads: "P. 4 OIL. 3 col x 22 PICA. "Moose Creek Test---." Across the model is a section of the future Moose Creek Dam, with the outlet works on the Chena River in the center. Alaskan visitors are watching the flow...
Title taken from verso. Verso reads: "P. 5 OIL. 3 col x 21 PICA. "Parallel Road---" On the west side of the dam there will be a paralleling access road. 90. 21." Verso is also stamped with the U.S. Army Corps of Engineers logo and the...
Title from verso. Verso reads: "P. 4 OIL. 3 col x 22 PICA. Alaskan visitors at single-bay model. At left, Don Thurston of U S Fish & Wildlife Service, then Bill Bradfield of the Lab staff, Lab Director Pete Smith (hands in pockets), and John...
Title taken from verso. Verso reads: "P. 5 OIL. 1 1/2 col x 18 PICA. "Chena Flow---." Close-up of a portion of the 100-foot long model of a 3-mile segment of the Chena River. Tinted water carrying strips of colored paper is passed down the...
Title taken from verso. Verso reads: "P. 5 OIL. 1 1/2 col x 18 PICA. "Dam bed---." Fairbanks Resident Engineer truck on the foundation of the northern section of Moose Creek Dam. Higher level at right is the dam's future access road. 65. 18."...
Title by indexer. Verso reads: "P. 4 OIL. 2 col x 30 PICA. Entrance to Lab. Office on grounds of Bonneville Dam. "Laboratory---" 130. 30." Verso is also stamped with the U.S. Army Corps of Engineers logo and the dates Sept. 1974 and Jan...
Title from verso. Verso reads: "South borrow pit, site of a possible future irregularly shaped recreation lake. Verso also stamped with the U.S. Army Corps of Engineers logo and the date Sept. 1974. Photo is taken from a fixed-wing...
Title from verso. Verso reads: "Hydraulic Laboratory Director Peter Smith. Measuring velocity of flow of water coming through the single-bay model gate and across the stilling basin." Image is related to construction of the Chena Lakes...
Title taken from verso. Verso reads: "Along the contractor's access road west of the damsite are several clearings where trees that had to be disposed of were buried and the soil placed on top of them was seeded. Grassy areas appealing to...
Title from verso. Verso reads: "Peter Smith. Director, North Pacific Division, Hydraulic Laboratory, Oregon. Lowering gate in model of one bay of the outlet works. Pebbles show water action in stilling basin." Verso also stamped with the...
Title from image. Image shows a posted sign labelled: Fairbanks Resident Engineer Office, Alaska District, U.S. Army Corps of Engineers. Also on the sign is the U.S. Army Corps of Engineers logo. Verso stamped with the same castle logo...
Title from caption. Caption also includes the number 338 and the word "Photocraft." Verso reads: "Ice breaking up in Copper River at the Chitina crossing Mile 132 C.R. & N.W. Ry. Stringers and rails taken up to save them from going into river....
Title from verso. Verso reads: "Tanana River Levee. The river is off to the right in this photo." Verso also stamped with U.S. Army Corps of Engineers logo and the date Sept. 1974. Image shows a man driving a truck along a dirt road...
Title from verso. Verso reads: "Contractor's dozer piles gravel at the south borrow pit for use in the Moose Creek Dam." Verso also stamped with U.S. Army Corps of Engineers logo and the date Sept. 1974. Image is related to...
Title from verso. Verso reads: "As gravel is removed from the south borrow pit for use in the dam foundation and embankment, the outline of a possible future recreation lake takes form." Verso also stamped with U.S. Army Corps of...
Title from verso. Verso reads: "A bed of fine gravel and silt goes on the upstream side of the Moose Creek Dam foundation." Verso also stamped with U.S. Army Corps of Engineers logo and the date Sept. 1974. Image shows a dump truck...
Title from verso. Verso reads: "Bridge across the Chena, part of the access road built by the Corps' contractor working on the north portion of the Moose Creek Dam foundation. This is downstream from the site of the future outlet works." ...